
Kolskaya Nuclear Power Plant, a Branch of JSC "Rosenergoatom Concern
Commissioning: 2014
Upgrade of the automatic CPM control system for units No. 3 and No. 4.
Equipment:
pH meters, oxygen meters, UPPs, sodium analyzers, conductivity meters, conductivity-concentration meters.
Implementation:
- Instruments for chemical and radiochemical monitoring (CRM) and sample preparation devices for Unit No. 3.
- Multichannel recorder for the CRM system.
- CRM instruments, sample preparation devices, and server for Unit No. 4.