
Portfolio

Turnkey installation of a chemical and radiochemical monitoring (CRM) system for a 390 MW CCGT unit (11 sampling points).
Kazanskaya CHPP PJSC "TGC-16"

Equipping the 450MW CCGT unit with a turnkey CPM control system (27 sampling points).
Huadian-Teninskaya CHPP PJSC "TGC-2" and Huadian Corporation, China

Upgrade of the automatic CPM control system for units No. 3 and No. 4.
Kolskaya Nuclear Power Plant, a Branch of JSC "Rosenergoatom Concern

Equipped with an automatic water-chemical regime control system for the BN-800 unit.